Drilling mud absorbentのメーカーや取扱い企業、製品情報、参考価格、ランキングをまとめています。
イプロスは、 製造業 BtoB における情報を集めた国内最大級の技術データベースサイトです。

Drilling mud absorbent - メーカー・企業と製品の一覧

Drilling mud absorbentの製品一覧

1~2 件を表示 / 全 2 件

表示件数

Soil water-absorbing agent for building pillars "Doro Unberu"

It is a soil water-absorbing agent specialized for pile driving operations. It quickly solidifies the muddy water generated during excavation, making transportation and disposal easier.

At Kanae Corporation, we offer a wide range of products that can be maintained long-term, contributing to "reducing running costs"! In the pole construction work for power distribution, groundwater often wells up from aquifers during excavation depending on the construction site, resulting in a large amount of muddy water (mud) that hinders operations. The generated muddy water (mud) is pumped out or removed manually, which requires considerable effort. Additionally, there is a method of adding bentonite as a water-absorbing agent to absorb the moisture from the turbid water before transporting the sediment, but this can cause dust to scatter during the addition process, potentially leading to complaints from nearby residents depending on the construction area. To address and prevent these issues, our company has developed a water-absorbing agent for excavation mud used in pole construction called "Doro Ukeru." By adding this product to construction sludge and mixing it with an auger, it can absorb the moisture from the muddy water (mud) and solidify within minutes. This allows for the easy lifting of mud that could only be removed by pumps or manual labor, and it keeps the sludge in a loose state, significantly reducing the likelihood of muddying the site. "Doro Ukeru" enables a substantial increase in efficiency for pole construction work.

  • 企業:カナエ
  • 価格:Less than 10,000 yen
  • IMG_3311.jpg
  • IMG_3317.jpg
  • Other polymer materials

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Soil Absorbent for Piling Construction "Doro Unberu Series"

A strong ally for pillar construction work! It solidifies troublesome mud in a short time, making transportation easier.

At Kanae Corporation, we offer a wide range of products that can be maintained over the long term, contributing to "reduction of running costs"! We would like to introduce our "Doro Ukeru Series." By introducing this product into muddy water (mud), and mixing it with an auger, it is possible to absorb the moisture from the muddy water (mud) and solidify it in a short time. Mud that could only be removed by pumps or manual labor can now be easily lifted with an auger, and since the sludge can be made to a dry state, the work site is hardly contaminated with mud. 【Features】 ■ Absorbs moisture in the mud and improves it to a dry or sticky texture ■ Almost eliminates contamination of the work site with mud ■ Solidification of mud with a small amount of additive ■ Two types are available in the lineup to accommodate various types of mud generated from construction sites: - Doro Ukeru No. 1: For general mud - Doro Ukeru No. 2: For special mud (contains lime and cement) ■ Prevents dust from scattering, reducing damage to nearby residents 【Usage Locations】 Pole construction, civil engineering, improvement and enhancement of muddy environments, spring water treatment, soil waste disposal *For more details, please refer to the PDF materials or feel free to contact us.

  • どろ運べーるシリーズ.PNG
  • どろ運べーるシリーズ2.PNG
  • どろ運べーるシリーズ3.PNG
  • Other consumables

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録